SBC Quick Code Reference - NFPA [2013 - 2022] and IFC [2015 - 2024]

TOPIC IFC 2015 IFC 2018 IFC 2021 IFC 2024
Approved  Emergency Services Department Communications Required Sec. 510.1, 510.2 Sec. 510.1, 510.2 Sec. 510.1, 510.2 Sec. 510.1 , 510.2
Note: Exception 4
One Story Buildings less than 12,000 Sq. Ft.
Field testing - Building Signal Coverage Assessment Required  510.6.3 510.6.4 510.6.4 510.6.4
Permit Required Section 510.3 Section 510.3 Section 510.3 Section 510.3
Listing of Equipment Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Sec. 510.4 Sec. 510.4
Limitation of External References Not specifically addressed Not specifically addressed Not specifically addressed Not specifically addressed
Signal Strength and Quality &
Area Coverage Required
-95 dBm Sec. 510.4.1
95% General - Sec. 510.4.1
99% Critical - Not Specifically Addressed in Sec. 510
DAQ 3.0 Sec. 510.4.1.1
95% General - Sec. 510.4.1
99% Critical - Sec. 510.4.2 Reference to NFPA 1221
DAQ 3.0 Sec. 510.4.1.1
95% General - Sec. 510.4.1
99% Critical - Sec. 510.4.2 Reference to NFPA 1221
DAQ 3.0 Sec.
95% General - Sec.
99% Critical - Sec. 
IFC reference to NFPA 1221 or 1225 Standards No Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Backbone / Riser Cable Defined Not Defined Not Defined Refers to NFPA 1221 Refers to NFPA 1221
Distribution / Feeder  Cable Defined IFC 2015 IFC 2018 IFC 2021 IFC 2024
Pathway Survivability: Fire Rating Not Defined Not Defined Refers to NFPA 1221 Refers to NFPA 1221
Pathway Survivability: Mechanical Protection Not Specifically Addressed in Section 510.
Referenced in 2013 NFPA 72 Section 24.3.6.8
Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Plenum Rated Coaxial Cable Required Not Specifically Addressed in Section 510.
Referenced in 2013 NFPA 72 Section 24.3.6.8
Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Lightning Protection Required Not Specifically Addressed in Section 510 Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Noise Floor Requirement Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Sec.    Reference to NFPA 1225
Technical Criteria to be Provided by AHJ(s) 510.4.2.2  510.4.2.2  510.4.2.2  510.4.2.2 
Standby Power 24 Hours - Sec. 510.4.2.3 12 Hours - Sec. 510.4.2.3 or
2-Hours Battery w/ Emergency Generator
12 Hours - Sec. 510.4.2.3 or
2-Hours Battery w/ Emergency Generator
12 Hours - Sec.  or
2-Hours Battery w/ Emergency Generator
Isolation of Donor Antenna Required Not Specifically Addressed in Sec. 510 20db - Sec. 510.4.2.4(4) 20 db Above System Gain - Sec. 510.4.2.4(4) 20 db Above System Gain - Sec. 510.4.2.4(4)
Cabinets for Equipment and Battery Backup Required NEMA 4 - Sec. 510.4.2.4 (1) & (2) NEMA 4/NEMA 3R - Sec. 510.4.2.4 (1) & (2) NEMA 4/NEMA 3R - Sec. 510.4.2.4 (1) & (2) NEMA 4/NEMA 3R - Sec.
Frequency License Holder Approval Required Yes under FCC Part 90.219 Referenced in Sec. 510.4 Yes under FCC Part 90.219 Referenced in Sec. 510.4 Yes under FCC Part 90.219 Referenced in Sec. 510.5 Yes under FCC Part 90.219 Referenced in Sec. 510.5
Oscillation Prevention 510.5.3 510.4.2.4 510.4.2.4 510.4.2.4
Monitoring By Fire Alarm Required 510.4.2.4 Yes - Sec. 510.4.2.5 Yes - Sec. 510.4.2.5 Yes - Sec. 510.4.2.5
Monitor Signal Source Malfunction Required Not Specifically Addressed in Section 510 Donor Antenna - Sec. 510.4.2.4(4) Donor Antenna - Sec. 510.4.2.4(4) Signal Source Sec. 
Dedicated Annunciation Required Sec. 510.4.2 Where Required by AHJ Sec. 510.4.2 Where Required by AHJ Sec. 510.4.2 Where Required by AHJ Sec. 510.4.2 Where Required by NFPA 1225
Additional Frequencies (May Include cellular and new technologies) Sec. 510.6.2 Additional Frequencies Made Available by FCC Sec. 510.6.2 Additional Frequencies Made Available by FCC Sec. 510.6.2 Additional Frequencies Made Available by FCC Sec.
Also see NFPA 1225 A3.3.63
Design Documents Not Specifically Addressed in Section 510 510.4.2.7  510.4.2.7  510.4.2.7 
Communication Antenna Density/Near Far Not Specifically Addressed in Section 510 Sec. 510.4.2.8 Sec. 510.4.2.8 Sec. 18.3.4
Mounting of Donor Antenna Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Sec. 510.5.1 Sec. 510.5.1
Approval prior to installation 510.5.1 510.5.1 510.5.2 510.5.2
Minimum qualifications of personnel 510.5.2 510.5.2 510.5.3 510.5.3
System Testing - Initial, Acceptance, Annual, 5-year New/Acceptance, Sec. 510.5.3
Annual Sec 510.6.1
New/Acceptance, Sec. 510.5.3
Annual Sec 510.6.1
New Systems Sec. 510.5.4
Annual - Section 510.6.1
New Systems Sec. 510.5.4
Annual - Section 510.6.1
Compliance with FCC Part 90.219 Sec. 510.5.4 Sec. 510.5.4 Sec. 510.5.5 Sec. 510.5.5
Responsibility to Prevent or Correct Interference with Public Safety System By reference: 510.5.4 FCC compliance By reference: 510.5.4 FCC compliance By reference: 510.5.5 FCC compliance By reference: 510.5.5 FCC compliance
Nonpublic safety system - non-interference Not Specifically Addressed in Section 510 510.6.3 510.6.3 510.6.3

TOPIC IFC 2015 IFC 2018 IFC 2021 IFC 2024
Approved  Emergency Services Department Communications Required Sec. 510.1, 510.2 Sec. 510.1, 510.2 Sec. 510.1, 510.2 Sec. 510.1 , 510.2
Note: Exception 4
One Story Buildings less than 12,000 Sq. Ft.
Field testing - Building Signal Coverage Assessment Required  510.6.3 510.6.4 510.6.4 510.6.4
Permit Required Section 510.3 Section 510.3 Section 510.3 Section 510.3
Listing of Equipment Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Sec. 510.4 Sec. 510.4
Limitation of External References Not specifically addressed Not specifically addressed Not specifically addressed Not specifically addressed
Signal Strength and Quality &
Area Coverage Required
-95 dBm Sec. 510.4.1
95% General - Sec. 510.4.1
99% Critical - Not Specifically Addressed in Sec. 510
DAQ 3.0 Sec. 510.4.1.1
95% General - Sec. 510.4.1
99% Critical - Sec. 510.4.2 Reference to NFPA 1221
DAQ 3.0 Sec. 510.4.1.1
95% General - Sec. 510.4.1
99% Critical - Sec. 510.4.2 Reference to NFPA 1221
DAQ 3.0 Sec.
95% General - Sec.
99% Critical - Sec. 
IFC reference to NFPA 1221 or 1225 Standards No Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Backbone / Riser Cable Defined Not Defined Not Defined Refers to NFPA 1221 Refers to NFPA 1221
Distribution / Feeder  Cable Defined IFC 2015 IFC 2018 IFC 2021 IFC 2024 DRAFT
Pathway Survivability: Fire Rating Not Defined Not Defined Refers to NFPA 1221 Refers to NFPA 1221
Pathway Survivability: Mechanical Protection Not Specifically Addressed in Section 510.
Referenced in 2013 NFPA 72 Section 24.3.6.8
Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Plenum Rated Coaxial Cable Required Not Specifically Addressed in Section 510.
Referenced in 2013 NFPA 72 Section 24.3.6.8
Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Lightning Protection Required Not Specifically Addressed in Section 510 Sec. 510.4.2 Reference to NFPA 1221 Sec. 510.4.2 Reference to NFPA 1221 Sec.    Reference to NFPA 1225
Noise Floor Requirement Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Sec.    Reference to NFPA 1225
Technical Criteria to be Provided by AHJ(s) 510.4.2.2  510.4.2.2  510.4.2.2  510.4.2.2 
Standby Power 24 Hours - Sec. 510.4.2.3 12 Hours - Sec. 510.4.2.3 or
2-Hours Battery w/ Emergency Generator
12 Hours - Sec. 510.4.2.3 or
2-Hours Battery w/ Emergency Generator
12 Hours - Sec.  or
2-Hours Battery w/ Emergency Generator
Isolation of Donor Antenna Required Not Specifically Addressed in Sec. 510 20db - Sec. 510.4.2.4(4) 20 db Above System Gain - Sec. 510.4.2.4(4) 20 db Above System Gain - Sec. 510.4.2.4(4)
Cabinets for Equipment and Battery Backup Required NEMA 4 - Sec. 510.4.2.4 (1) & (2) NEMA 4/NEMA 3R - Sec. 510.4.2.4 (1) & (2) NEMA 4/NEMA 3R - Sec. 510.4.2.4 (1) & (2) NEMA 4/NEMA 3R - Sec.
Frequency License Holder Approval Required Yes under FCC Part 90.219 Referenced in Sec. 510.4 Yes under FCC Part 90.219 Referenced in Sec. 510.4 Yes under FCC Part 90.219 Referenced in Sec. 510.5 Yes under FCC Part 90.219 Referenced in Sec. 510.5
Oscillation Prevention 510.5.3 510.4.2.4 510.4.2.4 510.4.2.4
Monitoring By Fire Alarm Required 510.4.2.4 Yes - Sec. 510.4.2.5 Yes - Sec. 510.4.2.5 Yes - Sec. 510.4.2.5
Monitor Signal Source Malfunction Required Not Specifically Addressed in Section 510 Donor Antenna - Sec. 510.4.2.4(4) Donor Antenna - Sec. 510.4.2.4(4) Signal Source Sec. 
Dedicated Annunciation Required Sec. 510.4.2 Where Required by AHJ Sec. 510.4.2 Where Required by AHJ Sec. 510.4.2 Where Required by AHJ Sec. 510.4.2 Where Required by NFPA 1225
Additional Frequencies (May Include cellular and new technologies) Sec. 510.6.2 Additional Frequencies Made Available by FCC Sec. 510.6.2 Additional Frequencies Made Available by FCC Sec. 510.6.2 Additional Frequencies Made Available by FCC Sec.
Also see NFPA 1225 A3.3.63
Design Documents Not Specifically Addressed in Section 510 510.4.2.7  510.4.2.7  510.4.2.7 
Communication Antenna Density/Near Far Not Specifically Addressed in Section 510 Sec. 510.4.2.8 Sec. 510.4.2.8 Sec. 18.3.4
Mounting of Donor Antenna Not Specifically Addressed in Section 510 Not Specifically Addressed in Section 510 Sec. 510.5.1 Sec. 510.5.1
Approval prior to installation 510.5.1 510.5.1 510.5.2 510.5.2
Minimum qualifications of personnel 510.5.2 510.5.2 510.5.3 510.5.3
System Testing - Initial, Acceptance, Annual, 5-year New/Acceptance, Sec. 510.5.3
Annual Sec 510.6.1
New/Acceptance, Sec. 510.5.3
Annual Sec 510.6.1
New Systems Sec. 510.5.4
Annual - Section 510.6.1
New Systems Sec. 510.5.4
Annual - Section 510.6.1
Compliance with FCC Part 90.219 Sec. 510.5.4 Sec. 510.5.4 Sec. 510.5.5 Sec. 510.5.5
Responsibility to Prevent or Correct Interference with Public Safety System By reference: 510.5.4 FCC compliance By reference: 510.5.4 FCC compliance By reference: 510.5.5 FCC compliance By reference: 510.5.5 FCC compliance
Nonpublic safety system - non-interference Not Specifically Addressed in Section 510 510.6.3 510.6.3 510.6.3
TOPIC NFPA 72-2013 NFPA 1221-2016 NFPA 1221 - 2019 NFPA 1225 - 2022
Approved  Emergency Services Department Communications Required NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10
Field testing - Building Signal Coverage Assessment Required  NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10
Permit Required Section 24.5.2.1.2 Section 9.6.6 Section 9.6.6 Section 18.7
Listing of Equipment Not Specifically Addressed Not Specifically Addressed Specific Listing Requirement is TBD by the AHJ Sec. 18.12.1.3
Limitation of External References Not specifically addressed Not specifically addressed Not specifically addressed 18.1.2
Signal Strength and Quality &
Area Coverage Required
-95 dBm Sec. 24.5.2.3
90% General - Sec. 24.5.2.2.2
99% Critical - Sec. 24.5.2.2.1
DAQ 3.0 Sec. 9.6.8
90% General - Sec. 9.6.7.5
99% Critical - Sec. 9.6.7.4
DAQ 3.0 9.6.8
90% General - Sec. 9.6.7.4
99% Critical - Sec. 9.6.7.3
DAQ 3.0 Sec. 18.9
95% General - Sec. 18.8.4
99% Critical - Sec. 18.8.3
IFC reference to NFPA 1221 or 1225 Standards N/A N/A N/A N/A
Backbone / Riser Cable Defined Not Defined Not Defined 3.3.10 3.3.10
Distribution / Feeder  Cable Defined Not Defined Not Defined 3.3.46 3.3.49
Pathway Survivability: Fire Rating 2 Hour for Riser Coaxial Cable - Sec. 24.3.6.8 2 Hour for Riser Coaxial Cable - Sec. 9.6.2.1.3 Backbone Cable Routed Through Enclosure Matching Bldgs.
Fire Rating - Sec. 9.6.2.3
Sections 18.12.3.1, 18.12.3.3, 18.12.3.4, 18.12.3.5, & 18.12.3.6
Pathway Survivability: Mechanical Protection Section 24.3.6.8 Levels DEFINED in Section 5.10
But REQUIREMENTS should be based upon NEC (NFPA 70) 
Levels DEFINED in Section 5.10
But REQUIREMENTS should be based upon NEC (NFPA 70) 
18.12.3.2 Refers to NEC
Plenum Rated Coaxial Cable Required Riser & Feeder Coaxial Cable - Sec. 24.3.6.8 Riser & Feeder Coaxial Cable - Sec. 9.6.2.1.1 Backbone & Distribution Antenna Cables
Sec. 9.6.2.1
Backbone & Distribution Antenna Cables
Sec. 18.12.3.1
Lightning Protection Required Not Addressed in Section 24.5.2 Sec. 9.6.3 - Installed per NFPA 780 Sec. 9.6.3 - Installed per NFPA 780 Sec. 18.4 - Refers to Article 820 of NFPA 70. Antenna discharge units shall be listed to UL 497C
Noise Floor Requirement Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed Sec. 18.9.3
Technical Criteria to be Provided by AHJ(s) 24.5.2.7 9.6.14 9.6.14 18.5, 18.11
Standby Power 12 Hours - Sec. 24.5.2.5.5.2 12 Hours - Sec. 9.6.12.2 12 Hours Battery or Generator - Sec. 9.6.12.2 12 Hours Battery or Generator - Sec.18.13.2 
Isolation of Donor Antenna Required 15db - Sec. 24.5.2.3.3 20db - Sec. 9.6.9 20 db Above System Gain - Sec. 9.6.9 Sec. 18.3.3.2 & 18.10
Cabinets for Equipment and Battery Backup Required NEMA 4/NEMA 4X - Sec. 24.5.2.5.2 NEMA 4/NEMA 4X - Sec. 9.6.11.2 NEMA 4/NEMA 4X & NEMA 3R for Batteries - Sec. 9.6.11.2 NEMA 4/NEMA 4X
Batteries - NEMA 3R - Sec. 18.3.1
Frequency License Holder Approval Required Yes under FCC Part 90.219 Yes under FCC Part 90.219 Sec. 9.6.2, 9.6.6.1 & 9.6.6.2 Sections 18.2.1, 18.7 & 18.12.1.1
Oscillation Prevention Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed 18.3.2
Monitoring By Fire Alarm Required Yes - Sec. 24.5.2.6 Yes - Sec. 9.6.13 Sec. 9.6.13 & Chapter 10 of NFPA 72 Sec. 18.14 & Chapter 10 of NFPA 72
Monitor Signal Source Malfunction Required Donor Antenna - Sec. 24.5.2.6(2)(a) Donor Antenna - Sec. 24.5.2.6(2)(a) Donor Antenna - Sec. 9.6.13.2.1(5) Sec. 18.14.1.2(2)(a)
Dedicated Annunciation Required Where Required, Sec. 24.5.2.6.2 Where Required, Sec. 9.6.13.2 Where Required, Sec. 9.6.13.2 Where Required, Sec. 18.14.2 
Additional Frequencies (May Include cellular and new technologies) All assigned frequencies & any modulation technology
Sec. 24.5.2.4 
All assigned frequencies & any modulation technology
Sec. 9.6.10 
All assigned frequencies & any modulation technology
Sec. 
All assigned frequencies & any modulation technology
Sec. 18.11
Design Documents 24.5.2.1.2 Not Specifically Addressed Not Specifically Addressed 18.7.1
Communication Antenna Density/Near Far Not Specifically Addressed Not Specifically Addressed Sec. 9.6.7.6 Sec. 18.3.4
Mounting of Donor Antenna Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed Sec. 18.3.3
Approval prior to installation 24.5.2.1.2 9.6.6.1 9.6.2 18.2, A.18.2.1
Minimum qualifications of personnel Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed 18.2 and 3.3.115,
Annex: A.3.3.115
System Testing - Initial, Acceptance, Annual, 5-year Sec. 24.5.2.1.2 & 14.4.10 Sec. 9.6.4, 11.3.9 & 11.3.9.1 Sec. 9.6.4, 11.3.9 & 11.3.9.1 18.5 & Section 20.3.10.1, See Annex
Compliance with FCC Part 90.219 Not Specifically Listed in the Standard, Required by Federal Law Not Specifically Listed in the Standard, Required by Federal Law Not Specifically Listed in the Standard, Required by Federal Law Sec. 18.7.2 & A.18.7.2
Also Req. Under FCC Rules in the US
Responsibility to Prevent or Correct Interference with Public Safety System 24.5.2.1.1 9.6.5 9.6.5 18.6
Nonpublic safety system - non-interference 24.5.2.1.1 9.6.5 9.6.5 18.6
TOPIC NFPA 72-2013 NFPA 1221-2016 NFPA 1221 - 2019 NFPA 1225 - 2022
Approved  Emergency Services Department Communications Required NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10
Field testing - Building Signal Coverage Assessment Required  NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10
Permit Required Section 24.5.2.1.2 Section 9.6.6 Section 9.6.6 Section 18.7
Listing of Equipment Not Specifically Addressed Not Specifically Addressed Specific Listing Requirement is TBD by the AHJ Sec. 18.12.1.3
Limitation of External References Not specifically addressed Not specifically addressed Not specifically addressed 18.1.2
Signal Strength and Quality &
Area Coverage Required
-95 dBm Sec. 24.5.2.3
90% General - Sec. 24.5.2.2.2
99% Critical - Sec. 24.5.2.2.1
DAQ 3.0 Sec. 9.6.8
90% General - Sec. 9.6.7.5
99% Critical - Sec. 9.6.7.4
DAQ 3.0 9.6.8
90% General - Sec. 9.6.7.4
99% Critical - Sec. 9.6.7.3
DAQ 3.0 Sec. 18.9
95% General - Sec. 18.8.4
99% Critical - Sec. 18.8.3
IFC reference to NFPA 1221 or 1225 Standards N/A N/A N/A N/A
Backbone / Riser Cable Defined Not Defined Not Defined 3.3.10 3.3.10
Distribution / Feeder  Cable Defined Not Defined Not Defined 3.3.46 3.3.49
Pathway Survivability: Fire Rating 2 Hour for Riser Coaxial Cable - Sec. 24.3.6.8 2 Hour for Riser Coaxial Cable - Sec. 9.6.2.1.3 Backbone Cable Routed Through Enclosure Matching Bldgs.
Fire Rating - Sec. 9.6.2.3
Sections 18.12.3.1, 18.12.3.3, 18.12.3.4, 18.12.3.5, & 18.12.3.6
Pathway Survivability: Mechanical Protection Section 24.3.6.8 Levels DEFINED in Section 5.10
But REQUIREMENTS should be based upon NEC (NFPA 70) 
Levels DEFINED in Section 5.10
But REQUIREMENTS should be based upon NEC (NFPA 70) 
18.12.3.2 Refers to NEC
Plenum Rated Coaxial Cable Required Riser & Feeder Coaxial Cable - Sec. 24.3.6.8 Riser & Feeder Coaxial Cable - Sec. 9.6.2.1.1 Backbone & Distribution Antenna Cables
Sec. 9.6.2.1
Backbone & Distribution Antenna Cables
Sec. 18.12.3.1
Lightning Protection Required Not Addressed in Section 24.5.2 Sec. 9.6.3 - Installed per NFPA 780 Sec. 9.6.3 - Installed per NFPA 780 Sec. 18.4 - Refers to Article 820 of NFPA 70. Antenna discharge units shall be listed to UL 497C
Noise Floor Requirement Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed Sec. 18.9.3
Technical Criteria to be Provided by AHJ(s) 24.5.2.7 9.6.14 9.6.14 18.5, 18.11
Standby Power 12 Hours - Sec. 24.5.2.5.5.2 12 Hours - Sec. 9.6.12.2 12 Hours Battery or Generator - Sec. 9.6.12.2 12 Hours Battery or Generator - Sec.18.13.2 
Isolation of Donor Antenna Required 15db - Sec. 24.5.2.3.3 20db - Sec. 9.6.9 20 db Above System Gain - Sec. 9.6.9 Sec. 18.3.3.2 & 18.10
Cabinets for Equipment and Battery Backup Required NEMA 4/NEMA 4X - Sec. 24.5.2.5.2 NEMA 4/NEMA 4X - Sec. 9.6.11.2 NEMA 4/NEMA 4X & NEMA 3R for Batteries - Sec. 9.6.11.2 NEMA 4/NEMA 4X
Batteries - NEMA 3R - Sec. 18.3.1
Frequency License Holder Approval Required Yes under FCC Part 90.219 Yes under FCC Part 90.219 Sec. 9.6.2, 9.6.6.1 & 9.6.6.2 Sections 18.2.1, 18.7 & 18.12.1.1
Oscillation Prevention Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed 18.3.2
Monitoring By Fire Alarm Required Yes - Sec. 24.5.2.6 Yes - Sec. 9.6.13 Sec. 9.6.13 & Chapter 10 of NFPA 72 Sec. 18.14 & Chapter 10 of NFPA 72
Monitor Signal Source Malfunction Required Donor Antenna - Sec. 24.5.2.6(2)(a) Donor Antenna - Sec. 24.5.2.6(2)(a) Donor Antenna - Sec. 9.6.13.2.1(5) Sec. 18.14.1.2(2)(a)
Dedicated Annunciation Required Where Required, Sec. 24.5.2.6.2 Where Required, Sec. 9.6.13.2 Where Required, Sec. 9.6.13.2 Where Required, Sec. 18.14.2 
Additional Frequencies (May Include cellular and new technologies) All assigned frequencies & any modulation technology
Sec. 24.5.2.4 
All assigned frequencies & any modulation technology
Sec. 9.6.10 
All assigned frequencies & any modulation technology
Sec. 
All assigned frequencies & any modulation technology
Sec. 18.11
Design Documents 24.5.2.1.2 Not Specifically Addressed Not Specifically Addressed 18.7.1
Communication Antenna Density/Near Far Not Specifically Addressed Not Specifically Addressed Sec. 9.6.7.6 Sec. 18.3.4
Mounting of Donor Antenna Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed Sec. 18.3.3
Approval prior to installation 24.5.2.1.2 9.6.6.1 9.6.2 18.2, A.18.2.1
Minimum qualifications of personnel Not Specifically Addressed Not Specifically Addressed Not Specifically Addressed 18.2 and 3.3.115,
Annex: A.3.3.115
System Testing - Initial, Acceptance, Annual, 5-year Sec. 24.5.2.1.2 & 14.4.10 Sec. 9.6.4, 11.3.9 & 11.3.9.1 Sec. 9.6.4, 11.3.9 & 11.3.9.1 18.5 & Section 20.3.10.1, See Annex
Compliance with FCC Part 90.219 Not Specifically Listed in the Standard, Required by Federal Law Not Specifically Listed in the Standard, Required by Federal Law Not Specifically Listed in the Standard, Required by Federal Law Sec. 18.7.2 & A.18.7.2
Also Req. Under FCC Rules in the US
Responsibility to Prevent or Correct Interference with Public Safety System 24.5.2.1.1 9.6.5 9.6.5 18.6
Nonpublic safety system - non-interference 24.5.2.1.1 9.6.5 9.6.5 18.6